Construction of Yen Dong water plant with a capacity of 40,000 m3/day-night and a water supply pipeline network “Notice ref No. 20220576130-00.
Project's investment objectives: To build a clean water plant to serve people in Yen Mo district and some communes in Yen Khanh and Kim Son districts; Widespread coverage of the percentage of households using clean water, at the same time contributing to improving the quality of water supply services, protecting people's health, in addition, the factory goes into operation to create more jobs for local workers. Improve the efficiency of land use, contribute to the socio-economic development of the locality as well as the province.
Scale of the project investment: Including a clean water plant with a capacity of 40,000 m3/day-night with an area of 22,000 m2, a clean water supply pipeline system with a length of 90,836 m, 02 pumping stations of first level with an area of 100 m2, and a system of equipment and machinery to operation (machinery and equipment, office equipment, transformer stations...) and the 800 m long water supply rehydration canal for Yen Dong reservoir (details in the attached file).
Preliminary total project implementation cost: VND 912.357.000.000
Compensation, support and resettlement expense: VND 15.000.000.000
Summary of the basic requirements of the project: After being selected, the investor must reach an agreement with the management and operation unit for the water supply unit in the area where the investor provides water, ensuring that the water supply area does not overlap. When designing the detailed pipeline network, it must not overlap with the pipe network currently supplying water of rural domestic water supply stations in the area. Calculation of water supply area must not include rural domestic water supply stations which are currently operating normally and have been assigned by the Provincial People's Committee to units and enterprises for management. Drilling, digging, cutting and sawing within the dike protection area, irrigation work protection scope; land areas of roads, road traffic safety corridors must be licensed according to regulations.
Investment duration and schedule: Project duration: 50 years. Investment progress: From 2022 - 2025 + from the fourth quarter of 2021 and to the end of 2022: Approving investment policies, bidding to select investors, carrying out investment preparation and site clearance procedures. In 2023: Deploy and complete the cluster of water plants, main pipes and water supply for neighboring residential areas. In 2024 and 2025: Complete construction of the pipeline network and water supply to the remaining areas of the project.
Project location: The factory construction area belongs to land plots No. 309, 311, 312, 313, 314, 315 map sheet No. 12 cadastral map of Yen Dong commune, Yen Mo district, Ninh Binh province and part of water surface area. Yen Dong lake. Specific locations are as follows: The North borders on rice-growing land; The East borders on rice cultivation land and rural clean water supply station; + The West borders the existing traffic road; The South borders on the air traffic corridor of Yen Dong lake. The water supply pipeline goes through Yen Mo district and some communes in Yen Khanh and Kim Son districts; mainly located in traffic safety corridors and roads and partly under the management of households, organizations and individuals.
Land area: 22.000 m2
Land use's purpose: Land for production and business establishments
Approved planning criteria: Decision No. 356/QD-UBND dated March 4, 2020 of the People's Committee of Ninh Binh province. Decision No. 514/QD-UBND dated May 17, 2021 of Ninh Binh Provincial People's Committee.
Deadline for investors to submit their project implementation registration document: 30/06/2022 16:00
Address, phone number, fax number of the Department of Planning and Investment: - Department of Planning and Investment of Ninh Binh province Address: No. 08 Le Hong Phong, Van Giang ward, Ninh Binh city, Ninh Binh province. Phone number: +84.2293.871156 Fax number: +84.2293.873381.
Other information: The entire area of land planned to build a water plant is currently the rice land of individual households and a part of water surface land under the management of the People's Committee of Yen Dong commune, the entire area of undissolved land ground clearance. The construction area of the water supply pipeline system is mainly located in the air traffic corridors of the traffic routes and partly under the management of households, individuals and organizations. Regarding this land area, before construction, investors directly work with households, individuals and organizations that have land to negotiate during construction, to avoid lawsuits. The clean water supply pipeline system with a length of 90.836 m in Section 1.2.1 is as follows: + HDPE pipe D630: 18.580m + HDPE pipe D560: 15.290m + HDPE pipe D450: 10.180m + HDPE pipe D315: 17.040m + HDPE pipe D225: 8.710m + HDPE pipe D160: 11.146m + HDPE pipe D110: 9.890m